#001 |
2010/10/01 |
Quantifying and Verifying trace stability of vector network analyzers at frequencies below 1GHz, Hamdi Mani, Chris Groppi, Judd Bowman |
#002 |
2010/12/22 |
MWA Antenna Impedance Measurements, Hamdi Mani, Judd Bowman |
#003 |
2010/12/30 |
MWA REVB LNA Measurements, Hamdi Mani, Judd Bowman |
#004 |
2011/01/27 |
MWA DUAL LNA (REV2) Measurements, Hamdi Mani, Judd Bowman |
#005 |
2011/05/13 |
EDGES Measurements, Hamdi Mani, Judd Bowman |
#006 |
2011/05/25 |
MWA Antenna Measurements at the Murchison Radio Observatory, Hamdi Mani, Judd Bowman |
#007 |
2011/05/24 |
Anritsu MS2035B VNA Stability Evaluation, Hamdi Mani, Judd Bowman |
#008 |
2011/07/19 |
MWA Beamformer Measurements at ASU, Hamdi Mani, Judd Bowman |
#009 |
2012/02/04 |
Charge Controller Communication using MatLab, Jose Chavez, additional files: Attachments.zip |
#010 |
2012/02/08 |
EDGES Antenna Variation Report, Tom Mozdzen |
#011 |
2012/02/09 |
EDGES Antenna Panel Thickness Variation Report, Tom Mozdzen |
#012 |
2012/02/09 |
EDGES Antenna S11 Simulations with a Ground Cone Report, Tom Mozdzen |
#013 |
2012/02/10 |
EDGES Antenna S11 Simulations with Conical Panels Report, Tom Mozdzen |
#014 |
2012/07/26 |
Implementation of Antenna Simulator with improved-balance choke balun, Raul Monsalve |
#015 |
2012/07/29 |
An Automated Test System to Characterize A Large number of MWA Beamformers, Hamdi Mani, Judd Bowman, Breana Branham, Jose Chavez |
#016 |
2012/07/29 |
DARE MRO Expedition: Deployment and Initial Measurements, Hamdi Mani, Judd Bowman, Sarah Easterbrook |
#017 |
2012/07/29 |
DARE MRO Data After Receiver Swap, Hamdi Mani |
#018 |
2012/09/06 |
Remote Solar Power and Data Acquisition System (RSPDAS) Report, Jose Chavez |
#019 |
2012/10/21 |
Hot Load for EDGES, Raul Monsalve |
#020 |
2012/10/21 |
Stability of ZVL3 VNA in the Lab, Raul Monsalve |
#021 |
2012/10/21 |
Stability of ZVA24 VNA in the Lab, Raul Monsalve |
#022 |
2012/11/26 |
Field Notes at the MRO (EDGES/DARE)- Handwritten, Jose Chavez |
#023 |
2012/12/17 |
MRO Field Report (2012 November), Jose Chavez, Hamdi Mani |
#024 |
2013/01/28 |
Precision Noise Source Measurement REV1, Hamdi Mani |
#025 |
2013/02/13 |
EDGES Spectrometer ADC card, Hamdi Mani |
#026 |
2013/02/17 |
Solid State Noise Source Calibration Using cryogenically cooled Thermal Noise generators, Hamdi Mani |
#027 |
2013/02/20 |
MATLAB Code used to remotely control the ZVL3 and ZVA24 Vector Network Analyzers via LAN to Automate measurements and log data, Hamdi Mani |
#028 |
2013/02/20 |
MATLAB Code used to remotely control the ZVL3 Spectrum Analyzer via LAN to Automate measurements and log data, Hamdi Mani |
#029 |
2013/02/22 |
Half Angle Sweep for Biconical Wire Skeleton Antenna, Jose Chavez |
#030 |
2013/02/25 |
MATLAB Code and GUI used to Talk to the LABJACK U3, configure the IOs as digital Outputs, Hamdi Mani |
#031 |
2013/02/25 |
Cryogenically Cooled 50 Ohm Terminations for Receiver Calibration, Hamdi Mani |
#032 |
2013/02/25 |
MATLAB Code and GUI used to control the MWA beamformer, Hamdi Mani |
#033 |
2013/02/28 |
Initial Measurement of the DARE engineering prototypeFront End unit (BALUN): Sparameters and Noise Temperature, Hamdi Mani |
#034 |
2013/03/02 |
RFI in ISTB4 Lobby (prep for Night of Open Door), Jose Chavez, Hamdi Mani |
#035 |
2013/03/07 |
DARE Balun with an external Noise Calibration source, Hamdi Mani |
#036 |
2013/03/07 |
Short report on Design, Assembly and testing of a cheap and easy to build solid state noise source, Hamdi Mani |
#037 |
2013/03/17 |
Comb Generator Stability Measurements, Jose Chavez |
#038 |
2013/03/17 |
PAPER balun schematic, Raul Monsalve (R. Bradley) |
#039 |
2013/03/27 |
Antenna Variable Parameter Sweep, Jose Chavez |
#040 |
2013/03/28 |
Radio Spectrum Allocation in Chile, Raul Monsalve |
#041 |
2013/04/07 |
bicoLOG 5070 Antenna Simulation, Jose Chavez |
#042 |
2013/04/07 |
bicoLOG 5070 Antenna Calibration, Jose Chavez |
#043 |
2013/04/16 |
Updated Antenna Results, Jose Chavez |
#044 |
2014/06/26 |
Investigating MWA delay power spectra, Michael Busch |
#045 |
2019/06/27 |
Cable Reflections in Autocorrelation Delay Spectra (OVRO-LWA), Judd D. Bowman |
#046 |
2020/10/06 |
(DORA #001) Sources of Background Light for DORA Cubesat and Ground Station, Judd D. Bowman |
#047 |
2020/10/15 |
(DORA #002) Jaime’s payload deployer hinge design testing, Mickey Horn |
#048 |
2023/06/09 |
(DORA #003) RF payload 8-channel low resolution spectrometer calibration, Titu Samson |
#049 |
2023/08/10 |
Beam Mapping of LWA using Pulsar Gating, Akshatha K Vydula |
#050 |
2023/08/10 |
Sensitivity analysis of pulsar beam mapping with the LWA and VLA, Akshatha K Vydula |
#051 |
2023/08/10 |
Observing Campaign for LWA Beam measurements, Akshatha K Vydula |
#052 |
2023/08/10 |
VLA 4-band beam width measurement using the holography observing mode, Akshatha K Vydula |
#053 |
2023/09/15 |
Ethernet cable testing for 100Mbps link, Titu Samson |
#054 |
2024/03/24 |
RF Payload for FM Signal Mapping in Low Earth Orbit, Titu Samson |
#055 |
2024/03/24 |
Calibration of RF Payload for FM Signal Mapping in Low Earth Orbit, Titu Samson |
#056 |
2024/03/24 |
MEMS Switch network, Titu Samson |
#057 |
2024/03/24 |
Comparison of E-calibration and manual calibration of VNA, Titu Samson |
#058 |
2024/03/24 |
Tuning J-board LNA to match the EDGES LNA S11, Titu Samson |
#059 |
2024/03/24 |
Raspberry Pi Computer Module 4 breakout board, Titu Samson |