| 1 | 2010/10/01 | Quantifying and Verifying trace stability of vector network analyzers at frequencies below 1GHz | Hamdi Mani, Chris Groppi, Judd Bowman |
| 2 | 2010/12/22 | MWA Antenna Impedance Measurements | Hamdi Mani, Judd Bowman |
| 3 | 2010/12/30 | MWA REVB LNA Measurements | Hamdi Mani, Judd Bowman |
| 4 | 2011/01/27 | MWA DUAL LNA (REV2) Measurements | Hamdi Mani, Judd Bowman |
| 5 | 2011/05/13 | EDGES Measurements | Hamdi Mani, Judd Bowman |
| 6 | 2011/05/25 | MWA Antenna Measurements at the Murchison Radio Observatory | Hamdi Mani, Judd Bowman |
| 7 | 2011/05/24 | Anritsu MS2035B VNA Stability Evaluation | Hamdi Mani, Judd Bowman |
| 8 | 2011/07/19 | MWA Beamformer Measurements at ASU | Hamdi Mani, Judd Bowman |
| 9 | 2012/02/04 | Charge Controller Communication using MatLab (additional files: Attachments.zip) | Jose Chavez |
| 10 | 2012/02/08 | EDGES Antenna Variation Report | Tom Mozdzen |
| 11 | 2012/02/09 | EDGES Antenna Panel Thickness Variation Report | Tom Mozdzen |
| 12 | 2012/02/09 | EDGES Antenna S11 Simulations with a Ground Cone Report | Tom Mozdzen |
| 13 | 2012/02/10 | EDGES Antenna S11 Simulations with Conical Panels Report | Tom Mozdzen |
| 14 | 2012/07/26 | Implementation of Antenna Simulator with improved-balance choke balun | Raul Monsalve |
| 15 | 2012/07/29 | An Automated Test System to Characterize A Large number of MWA Beamformers | Hamdi Mani, Judd Bowman, Breana Branham, Jose Chavez |
| 16 | 2012/07/29 | DARE MRO Expedition: Deployment and Initial Measurements | Hamdi Mani, Judd Bowman, Sarah Easterbrook |
| 17 | 2012/07/29 | DARE MRO Data After Receiver Swap | Hamdi Mani |
| 18 | 2012/09/06 | Remote Solar Power and Data Acquisition System (RSPDAS) Report | Jose Chavez |
| 19 | 2012/10/21 | Hot Load for EDGES | Raul Monsalve |
| 20 | 2012/10/21 | Stability of ZVL3 VNA in the Lab | Raul Monsalve |
| 21 | 2012/10/21 | Stability of ZVA24 VNA in the Lab | Raul Monsalve |
| 22 | 2012/11/26 | Field Notes at the MRO (EDGES/DARE) - Handwritten | Jose Chavez |
| 23 | 2012/12/17 | MRO Field Report (2012 November) | Jose Chavez, Hamdi Mani |
| 24 | 2013/01/28 | Precision Noise Source Measurement REV1 | Hamdi Mani |
| 25 | 2013/02/13 | EDGES Spectrometer ADC card | Hamdi Mani |
| 26 | 2013/02/17 | Solid State Noise Source Calibration Using cryogenically cooled Thermal Noise generators | Hamdi Mani |
| 27 | 2013/02/20 | MATLAB Code used to remotely control the ZVL3 and ZVA24 Vector Network Analyzers via LAN to Automate measurements and log data | Hamdi Mani |
| 28 | 2013/02/20 | MATLAB Code used to remotely control the ZVL3 Spectrum Analyzer via LAN to Automate measurements and log data | Hamdi Mani |
| 29 | 2013/02/22 | Half Angle Sweep for Biconical Wire Skeleton Antenna | Jose Chavez |
| 30 | 2013/02/25 | MATLAB Code and GUI used to Talk to the LABJACK U3, configure the IOs as digital Outputs | Hamdi Mani |
| 31 | 2013/02/25 | Cryogenically Cooled 50 Ohm Terminations for Receiver Calibration, configure the IOs as digital Outputs | Hamdi Mani |
| 32 | 2013/02/25 | MATLAB Code and GUI used to control the MWA beamformer | Hamdi Mani |
| 33 | 2013/02/28 | Initial Measurement of the DARE engineering prototypeFront End unit (BALUN): Sparameters and Noise Temperature | Hamdi Mani |
| 34 | 2013/03/02 | RFI in ISTB4 Lobby (prep for Night of Open Door) | Jose Chavez, Hamdi Mani |
| 35 | 2013/03/07 | DARE Balun with an external Noise Calibration source | Hamdi Mani |
| 36 | 2013/03/07 | Short report on Design, Assembly and Testing of a cheap and easy to build solid state noise source | Hamdi Mani |
| 37 | 2013/03/17 | Comb Generator Stability Measurements | Jose Chavez |
| 38 | 2013/03/17 | PAPER balun schematic | Raul Monsalve (R. Bradley) |
| 39 | 2013/03/27 | Antenna Variable Parameter Sweep | Jose Chavez |
| 40 | 2013/03/28 | Radio Spectrum Allocation in Chile | Raul Monsalve |
| 41 | 2013/04/07 | bicoLOG 5070 Antenna Simulation | Jose Chavez |
| 42 | 2013/04/07 | bicoLOG 5070 Antenna Calibration | Jose Chavez |
| 43 | 2013/04/16 | Updated Antenna Results | Jose Chavez |
| 44 | 2014/06/26 | Investigating MWA delay power spectra | Michael Busch |
| 45 | 2019/06/27 | Cable Reflections in Autocorrelation Delay Spectra (OVRO-LWA) | Judd D. Bowman |
| 46 | 2020/10/06 | (DORA #001) Sources of Background Light for DORA Cubesat and Ground Station | Judd D. Bowman |
| 47 | 2020/10/15 | (DORA #002) Jaime’s payload deployer hinge design testing | Mickey Horn |
| 48 | 2023/06/09 | (DORA #003) RF payload 8-channel low resolution spectrometer calibration | Titu Samson |
| 49 | 2023/08/10 | Beam Mapping of LWA using Pulsar Gating | Akshatha K Vydula |
| 50 | 2023/08/10 | Sensitivity analysis of pulsar beam mapping with the LWA and VLA | Akshatha K Vydula |
| 51 | 2023/08/10 | Observing Campaign for LWA Beam measurements | Akshatha K Vydula |
| 52 | 2023/08/10 | VLA 4-band beam width measurement using the holography observing mode | Akshatha K Vydula |
| 53 | 2023/09/15 | Ethernet cable testing for 100Mbps link | Titu Samson |
| 54 | 2024/03/24 | RF Payload for FM Signal Mapping in Low Earth Orbit | Titu Samson |
| 55 | 2024/03/24 | Calibration of RF Payload for FM Signal Mapping in Low Earth Orbit | Titu Samson |
| 56 | 2024/03/24 | MEMS Switch network | Titu Samson |
| 57 | 2024/03/24 | Comparison of E-calibration and manual calibration of VNA | Titu Samson |
| 58 | 2024/03/24 | Tuning J-board LNA to match the EDGES LNA S11 | Titu Samson |
| 59 | 2024/03/24 | Raspberry Pi Computer Module 4 breakout board | Titu Samson |
| 60 | 2025/03/18 | REDGES S11 delay and polyfitting after S11 calibration | Titu Samson |
| 61 | 2025/03/18 | Testing the J-Board for EMI | Titu Samson |
| 62 | 2025/03/18 | Low noise 80VDC power supply for MEMS RF switch | Titu Samson |
| 63 | 2025/06/16 | (LWA-MC #001) First Test of LWA Antenna and FEE on Site | Judd Bowman |
| 64 | 2025/06/17 | (LWA-MC #002) Initial Soil Depth Tests and Oz-Post Options | Judd Bowman |